Current Position:Home > Updating a Real-time Infocube

Updating a Real-time Infocube

Update:10-11Source: network consolidation
Advertisement
Hi All,
In one of the requirements in BPS planning.
We are using the Exit function for validating the data.
In our function module we are fetching the data and two of the fields in the cube needs to be modified in the cube after completion of the validations.
I would like to know if there is any existing functionality or Function module in BPS planning for this for updating the Real-time Info cube.
Thanks
Prathish

The Best Answer

Advertisement
Try this link:
www.geocities.com/cynarad/reference_for_bps_programming.pdf
In the chapter where table xth_data is described more detailed this can be one possibility to validate your realtime IC.
Have fun,
Clemens
  • Error while updating to target type INFOCUBE Update:10-11

    Hi, After BI SP16 Upgrade, we noticed that data load to a cube with DTP (7X DS) with partioning active, it would error out saying, "Error while updating to target " " type INFOCUBE....we applied note '1148007' and did reactivation of relate

  • Two Update Rules populating One Infocube Update:11-30

    Hi all Im a little confused: 1) I have to add a characteristic to an Infocube.Which I did and also assigned it to an appropriate dimension. 2)There are two update rules populating the Infocube. 3)The new charcteristic that ive added to the cube has t

  • Rule incorrect error in the update rule of standard infocube Update:11-30

    hi, In the standard Appraisal infocube(BW 3.X) i have added a new keyfigure field  and written a rule in the update rule to populate datas. whn i checked for sytax errors, saved and return to the update rule screen it displays a red status for tht ke

  • New InfoObject - update of data in InfoCube Update:11-30

    Hi guys, I put a new InfoObject into the InfoCube. In development system I deleted all data in the cube and after that I load it again (full update). Everything worked fine. The new object was filled. In productive system I can not delete the data fr

  • How to avoide duplicacy when doing Full Update from Datasource to Infocube Update:11-30

    Hi, I am loading the data from 0HR_PA_OS_1 datasource to infocube 0PAOS_C01 infocube.Implementing the standard Business content. The Plan is to load the data Monthly Once. If by mistake, if the data is loaded more than once in a month the duplicates

  • Updating a Real-time Infocube Update:10-11

    Hi All, In one of the requirements in BPS planning. We are using the Exit function for validating the data. In our function module we are fetching the data and two of the fields in the cube needs to be modified in the cube after completion of the val

  • Updating data from ODS to InfoCube Update:11-30

    Hello experts, I am not sure if my approach works so let me elaborate: ODS1 contains trips on participant level. The data in ODS1 looks like this: ODS1: trip_id___participant_id___price_____trip date __101_____1___________25.00_____20070112 __101____

  • Generic DataSource cannot be updated in an InfoCube! Update:11-30

    Hi Expert We have a Z infocube that is loaded directly by a Generic Datasource. We setup a infopack for initialize delta precess and other for Delta Update. With a DTP Full we load the initial data, but when we try to setup a DTP for Delta informatio

  • Please Help,  make conversion UOM in query or Update Infocube? Update:11-30

    Hi!   I have a new requirement, but I don't know how I can solved, I write in order to ask help  : The requiremen is: we have an information on InfoCube, this information contain Quanity original of the invoice... we save this vale on ZCANTIDAD, and

  • End routine not updating all records Update:10-11

    Hi, I have an end routine to update a cube from another cube. The routine has two loops, one child loop inside the main loop. Result Package was sorted before the loops. Now, not all records were updated in the target infocube as per expectation. Als