  • KP06 & KP26 - Proceedure Updated:11-30

    hai, In KP06 we are planning input based on primary cost element. Sametime in KP26 we are planning the capacity based on secondary cost element. After assigning the same in project, the system displays the detail based on the secondary cost element n

  • I want to set EXIT for KP06, KP26, KP46 Updated:11-30

    Hi Experts. I'm in trouble. I have to set EXIT that can control "CostCenter" or "CostCenter Group" in KP06, KP26, KP46. For Example in KP06, if a user inputs cost-center value "100000" in cost center field, then error message

  • Kp06 - kp26 Updated:11-30

    hi gurus, i had a confusion in this area.  please let me know the difference.  as per as my knowledge in KP06 u have to give ur COST ELEMENT and COST CENTER,  in KP26 we have to give ATY TYPE and COST CENTER. in above senario, we have to do planning

  • Variable costs - KP06, KP26 Updated:11-30

    Hi, We have an interesting situation here - it seems as if when the user runs the KSPI transaction, it adjusts the total variable costs on the KP06 screen, and not the price on the KP26 screen, when the volumes are changed. Now I can see the advantag

  • KP06/KP26 Plan Upload Updated:11-30

    We have around 40 cost centres for which plan figures need to be uploaded.  Is there any way where we can upload the cost element planning for all these cost centres at a stretch (i.e. rather than uploading the figures for the cost centres one by one

  • Difference type of activity Updated:11-30

    Dear Sir/Madam,        What is the difference between Kp26 And Kp06 And kb21n Tell me if i'm wrong !! KP06 is for cost center(production / Non prdn) cost element planning KP26 is for production cost center with activity planning KB21N  is for which r

  • KP06 Layouts Updated:11-30

    Hi Gurus, Can we restrict the display of layouts in KP06. Eg: if 5 layouts has been defined for Planner Profile.       While calling KP06 can we restrict to display only one layout of our choice.Hi, you define the assignment of planning layouts to pl

  • KP26 Planning - Cost Centre Group Updated:11-30

    Hi I am trying to enter the plan activity type figures and amount through KP26.  I have selected the standard layout 1-201.  I entered a cost centre group and activity type.  However, when  going inside, It is coming only for a cost cetnre.  Why it i

  • Cost component not splitting at the time of Rune the tine of Cost Estimate Updated:10-11

    http// Hi, We are in developing phase for Product costing for coal mine project , we have raise coal material with Non component BOM , and Routing is only one activity with 400- Raised Coal Qty-MT , We upload the plan with Production cost center -act

  • Copa actual and planning data Updated:11-30

    Hi, May I know if I am correct for the below where 1) KE26 or KE21N is meant for correction of actual data in copa and KE13N or KEPM is to load copa planning to copa 2) we have many planning tcode like kpf6, kp06, kp26. what is the difference between

  • Activity Rate change Updated:11-30

    Hello Gurus, I want to know how to change the activity price rate manually and also Last month production order also I want to change the new activity rate (confirmed orders) Can anyone give me the clarity on this, (because I have confused on the bel

  • CO-period lock for planning on company code level Updated:10-11

    Hello, I would like to ask you for assistence. We would like to have the possiblity to lock the CO-periods on company code levels. For actual values, it is possible to arrange this within the validation. However, for plan values the validation is not

  • Costing Data: UOM Conversion for Activities Updated:11-30

    Hi Experts, I would like to know what transaction (or if there's a transaction/table) to check the UOM conversion of activities in the costing data (tcode CK11N). Let say the activity HEAT, conversion from KWH <-> GJ? Thanks so much! Best Regards, K

  • Activity Type Price Updated:11-30

    Is it possible to maintain  Activity Type Price in Currency other than Co Code and Cont Area? If yes then How?Hi, Check with this.The activity amount you are planning in KP06 & KP26 with activity quantity & after run KSPI the rate will calculate &

  • Actual Cost Machine hours is zero (After confirmation) Updated:11-30

    Dear Guru, We are implementing PP module and product costing. We enter the budget with activity type in KP06 & KP26. After confirmation, the actual cost in machine hours is zero but not in electricity or steam. Why the actual cost is zero in activity

  • KSP4, KSVB, KSUB Updated:11-30

    Gurus, Now that I have populated values through KP06, KP26, KP46. I'm trying to go ahead with KSP4, KSVB, KSUB The case with KSP4 is that I try to run all of the cost centers and the result the system gives is 'NO ERRORS' but also not relevant. What

  • External processing other than subcontracting Updated:11-30

    Dear Experts. My scenario is as follows: In our routing there are 2 processes: Internal - Activity Types ( Planned Price KP06/KP26) External - Purchase requisition/ Purchase order - Directly maintaining in Routing itself under "Net Price Tab" it

  • Activity Standard Price Updated:11-30

    Dear All, I have a Standard Price in my plance.  Each and Every Standard Price is Available i need not to go KP06 & KP26; KPSI.  We have a standard Price.  Can i enter that Standard Price in KP26 Transaction? RegardsHi, Yes it is possible to post dir

  • Difference between KP06 and KP26 Updated:11-30

    Hi, Could anyone explain me when to use KP06 and when to use KP26 and the basic technical difference between these two transaction codes. Regards, DSKHi, KP06 is used to plan the primary costs (cost elements). You can do it activity dependent or inde

  • Kp26 Vs Kp06 Updated:11-30

    Hello all, Just wondering is there any specific difference between transcation code kp26 & kp06 ? They use the same program though !! regards Pbb Moderator: Please, avoid asking basic questionsHI, Kp06 is for entering the planned cost for the cost ce