Current Position:Home > epmdimensionoverride multiple members

epmdimensionoverride multiple members

Advertisement
  • Cannot add multiple members of a failover cluster to a DFSR replication group Updated:10-11

    Server 2012 RTM. I have two physical servers, in two separate data centers 35 miles apart, with a GbE link over metro fibre between them. Both have a large (10TB+) local RAID storage arrays, but given the physical separation there is no physical shar

  • Multiple members in a substitution variable Updated:10-11

    <p>Hi,</p><p> </p><p>I use substitution variables in Planning forms to choose wichyear to display.  I would like to have FY06, FY07 andFY08 in the same variable.  I just tried to add it in AAS(separeted by commas) and there i

  • How do I move multiple dimension members up one level in planning? Updated:10-11

    I can't figure out how to select multiple members. I hope I don't have to cut and paste them individually.ODI maybe ? Cheers John http://john-goodwin.blogspot.com/Read other 2 answers

  • Report with multiple choice in column for same dimension...... Updated:10-11

    Hi All, We have a report with two dimensions in col , one in row remaining in pov...user want to select multiple members [its more than 10 members..so we thought prompts will not be good.] for one column for different members in second dimension of c

  • How to manage multiple itunes gift cards on one account? Updated:10-11

    I am assuming our family is not the only one that had gift cards received as Christmas gifts--for multiple members of the family, who all use one iTunes account. I cannot figure out how Billy's $20 avoid being used by Sally, who has her own $20 gift