Current Position:Home > Prodcution Scheduling Profile for without material process order

Prodcution Scheduling Profile for without material process order

Update:10-11Source: network consolidation
Advertisement
Hello Gurus,
I am creating process order without material and assigning Production Scheduling Profile in assignment tab. Production Scheduling Profile  has release on creation activated in configure, but when I save process order its not released, it remains as CRTD.
When I am creating process order with material as you know Production Scheduling Profile is copied from material master and when I save process order, its automatically released.
I am assigning same Production Scheduling Profile which I am using for second case listed above.
Any ideas?
Thanks
Bhavesh Patel

The Best Answer

Advertisement
Dear Patel,
I Already told, once , you are in order  screen, system status will set as CRTD, after that if U assigned, the PSP, It won't work,  In case of COR1, material have PSP, If you convert planned order to production, release is triggered in background before the status is created.
If you have still doubt
Create a order in COR1, When you enter the quantity and start date finish date then release is carried out and the status is set as CRTD
in CORO
It is not possible to  maintain PSP before entering the qty and Dates
Once U entered the dates, Sytem set the status as created, After you assigna PSP, It won't work
Regards,
Sundaresan
Edited by: Sundaresan . E. V on Sep 14, 2010 7:01 PM
  • Prodcution Scheduling Profile for without material process order Update:10-11

    Hello Gurus, I am creating process order without material and assigning Production Scheduling Profile in assignment tab. Production Scheduling Profile  has release on creation activated in configure, but when I save process order its not released, it

  • Basic and scheduling  dates & time calculation in process order creation Update:10-11

    Hi guru's, i have one requirement, i need to calculate and display the basic and scheduled dates & times based on the given input i.e material , plant , process order type , quantity , UOM and scheduling type ( for corresponding scheduling type user

  • Report on settlement profile/rule for the Process Orders ? Update:10-11

    Is there any report which will display settlement profile for process order or settlement rule for process order.Hi, Did you try this one: KOSRLIST_OR - Settlement Rules? Regards, EliRead other 2 answers

  • Scheduled finish date for process orders not updating in BW Update:10-11

    We are having problems with the scheduled finish date (GLTRS) for process orders. When the process order is already released, changes done in R/3 on the scheduled finish date will not result to a delta hence data in BW is not updated. Table AFKO, whe

  • Process order type conflict Update:10-11

    Hi, I am trying to create a process order from a planned order. I have generated the planned order through MRP run. The process order that is generating taking process order type which is not desired. I want to know from where it takes the process or

  • Order type is not picking while converison Plnd to process order Update:10-11

    Dear Dudes, i have maintained production scheduling profile in all material masters in which order type is specified. while converting planned order to process order order type is not picking. thanks in advance.Robert, Since you are using same order