Dear all,
Kindly give solution for this scenerio..............................
I am creating Process Order with ref of sale order manually in cor1. In the COR1 screen copy from field i gave my ref sale order, so that particualr order and batch is assigned to that order only.
My problem was suppose if sale order is created for 10 tonns, but my batch size and resource capacity is 2 tonns only. so first time i change my batch quantity 2 tonns instead of 10 tonns and created my order and confirmed.
if i go to second time the same process i am doing creating process order with ref of same sale order but it comes again 10 tonns instead of 8 tonns. why it comes like this already i confirmed 2 tonns in this sale order?
my requirement is if any process order is created with ref of any sale order and again if i am creating any process order with ref of same sale order left quantity only system should show.
for this what i have to do kindly help to this
regards,
s.sakthivel

The Best Answer

Advertisement
Dear KK,
Pls check whether ZKIN, ZKQT, ZKOR have all the properties similar to IN, QT, OR respectively. If they are different, please ensure that you know the reason why they are different. This check has to be done at tcode VOV8
Some fields like sales document category, Transaction group, screen seq group, Doc pricing procedure need to be similar to the parent document unless you know why you have changed them.
Once this check is done, check the copy controls in VTAA. Before that try creating these documents separately without reference. This shoudl work fine only after which you need to check copy control. If this is not working fine, then there is some problem with the document type settings in VOV8. Testing this is possible only if Reference mandatory field is left empty. Make sure that is properly configured.
Once this is done, check copy controls in VTAA. You can just copy the copycontrol between IN and QT and QT and OR and create for ZKIN to ZKQT and ZKQT to ZKOR.
Once this is done, check whether your item category settings are properly done , also the schedule line settings. The tcodes are VOV7, VOV6, VOV4, VOV5 etc.
Now check whether your material master and customer master are consistent with the item category settings(Item category group).
Now create the transaction. It shoudl work fine.
Reward if this helps.
  • Problem creating process order with ref of sale order Update:10-11

    Dear all, Kindly give solution for this scenerio.............................. I am creating Process Order with ref of sale order manually in cor1. In the COR1 screen copy from field i gave my ref sale order, so that particualr order and batch is ass

  • Problem on creating process order Update:10-11

    Dear Team, I have a problem on creating process order thru COR1 where the basic start date only accept and follows current date. Basic finished date, no problem. Previously, i can set the basic start date using previous date / date in the past (in th

  • Problem with creating Process order confirmation using BAPI Update:10-11

    Hello, While creating Process Order confirmation using BAPI_PROCORDCONF_CREATE_TT, material document is getting created. But a line item is inserted in the table AFRU without material document number. When it is created manually using the transaction

  • Error in manual batch determination while creating process order Update:10-11

    Hi Expert, Manual batch determination is happening for some of material and for some material it is working firne  when creating process order, Pleae assist Thanks IntekhabDear, please open this prd order in change mode CO02 then press tab button cos

  • Problem during Process Order creation Update:10-11

    Hi, I have problem while creating Process Order. I have maintained all the basic data required to create the process order. When I Release the order, I am able to create the control recipe also, but PI sheet is not generated along with it. System giv

  • Problem in Process Order Update:10-11

    Hi! While creating Process Order, storage location is getting filled by default in Material list. The Issue storage location has been kept blank in MRP 2 view of material master. Can you advice where can be the problem. Thanks in advance. Regards Din

  • User Status change problem in Process Order Update:10-11

    Hi, We are in process of upgrading our system from 4.6C to ECC 6.0. I have a problem with User status change for process Orders. In 4.6C we are using the profile x with settings: 10     ZNEW     Created process order     10     90     1     1     ZST

  • Create Process Order by BAPI (COR6) Update:11-30

    Hi, I am looking for BAPI to create Process Order (Order category = 40), Instead of doing BI to transaction COR6. I try <b>BAPI_PRODORDCONF_CREATE_HDR</b> but with no success, because it works only with Production Order (Order category = 10).

  • Create process order confirmation Update:11-30

    Hello, I use the Bapi 'BAPI_PROCORDCONF_CREATE_TT' to create a confirmation in our Z program to replace 'COR6N'. The only problem I meet is that it makes a material document for the good movements but don't write it in the table AFRU (field WABLNR).

  • Stop Creation of reservation while creating process orders.... Update:11-30

    Hi All, THe requirement is to stop creation of reservations on creation of process order. have done the configuration in order type dependent parameters to stop creation of reservations on creation of process order. After this configuration the reser