Hi,
      I would like to know about the Estimate required for a particular requirement.
For example,u  need to set up a generic extractor based on 2 tables and then replicate it on BW side.
1)Logistics invoice verification:-Do we have any standard Extractor in R/3 for this.I have identified 2 tables RBKP and RSEG.So,I need to generate a view and build a generic extractorand then replicate it in BW.Can u tell me the estimate required for this along  with building a cube ,Infosurces etc.
Thanks,
Samir

The Best Answer

Advertisement
Sure - where do you want me to send the Purchase Order to?
In all seriousness - the generic extractor idea MAY work if you can find a timestamp or you may want to use a change pointer to generate a record
Then you will need a DSO to resolve duplicates and then build the cube
The estimate will be based on - how good are your abap skills, and how good are your BW skills
If you can;t find a std extractor do this (and I do believe there is one already) - then doing the work yyoru BI architect suggested - then about 10-25 days - and then puls opr minus denpending on whther the testing documentation needs to be watertight for SoX or ISO compliance
  • NEW DEVELOPMENT AND ESTIMATE Update:10-11

    Hi,       I would like to know about the Estimate required for a particular requirement. For example,u  need to set up a generic extractor based on 2 tables and then replicate it on BW side. 1)Logistics invoice verification:-Do we have any standard E

  • Estimation Technique for ABAP programmimng Update:11-30

    Hi, I would like to know if there are any formal software estimation techniques that may be used for ABAP development.The commonly used estimation techniques such as Function Point/LOC etc do not seem to fit in.We currently use WBS methodology but he

  • ABAP Development Estimate Update:11-30

    Hello, I have user request to develop a custom ABAP program that would combine the following: 1.  Credit Master Data, Limits and Exposure data from FD33. 2.  VA05 Order Backlog data 3.  KE30 PA Report showing sales by customer and sales area. 4.  A/R

  • SAP tool to estimate time for web dynpro development project Update:11-30

    Hi, Is there any standard SAP tool available to estimate time for web Dynpro development project? Thanks and Regards, DeeptiHi Deepti An implementation of Webdynpro based UI could be estimated by a 'standard' technique like any other U: 1. Try to cou

  • How do we estimate the work flow development. Update:11-30

    What are the different factors that are to be considered while developing a workflow.Very similar to any custom development projects. For example, the complexity of the customizations, the sophistication of the process flows, the number of systems wh

  • Rough Estimate for Cost of Developing Image Editing Tool? Update:11-30

    Hello all, Anyone have an idea of what it would cost to have a flash developer create an image editing tool from scratch?  Normal tasks such as resize and rotation as well as redeye and color correction including auto sepia color woudl be needed. A b

  • Material cost estimate report development Update:10-11

    Hi All, Customer need a report with belwo inputs 1.Plant 2. Material 3. MRP Controller 4. Costing Variant 5. Valid On with M09 MRP controller with the output as - where M09 is there it should not display the sub-materilas in it,for the remaining it i

  • Cost component not splitting at the time of Rune the tine of Cost Estimate Update:10-11

    http// Hi, We are in developing phase for Product costing for coal mine project , we have raise coal material with Non component BOM , and Routing is only one activity with 400- Raised Coal Qty-MT , We upload the plan with Production cost center -act

  • Report for Cost Estimate Update:10-11

    Hi, Our client require a report for Planned Cost Estimate, where costing run will be on FG product and Client want Activity Hours and Cost for that FG product. (for all the FG products we have multilevel BOM and Routing hence, Activity Hours are main

  • How can I estimate the final size of my .ipa? Update:10-11

    Hello there, As far as I know there is no "scietific method" to find out how many megabytes will be added to an application after it was uploaded to the Apple Store. For example, my app in origin was 14.680.351 bytes and just when I've finished