Current Position:Home > NEW DEVELOPMENT AND ESTIMATE

NEW DEVELOPMENT AND ESTIMATE

Update:10-11Source: network consolidation
Advertisement
Hi,
      I would like to know about the Estimate required for a particular requirement.
For example,u  need to set up a generic extractor based on 2 tables and then replicate it on BW side.
1)Logistics invoice verification:-Do we have any standard Extractor in R/3 for this.I have identified 2 tables RBKP and RSEG.So,I need to generate a view and build a generic extractorand then replicate it in BW.Can u tell me the estimate required for this along  with building a cube ,Infosurces etc.
Thanks,
Samir

The Best Answer

Advertisement
Sure - where do you want me to send the Purchase Order to?
In all seriousness - the generic extractor idea MAY work if you can find a timestamp or you may want to use a change pointer to generate a record
Then you will need a DSO to resolve duplicates and then build the cube
The estimate will be based on - how good are your abap skills, and how good are your BW skills
If you can;t find a std extractor do this (and I do believe there is one already) - then doing the work yyoru BI architect suggested - then about 10-25 days - and then puls opr minus denpending on whther the testing documentation needs to be watertight for SoX or ISO compliance
  • NEW DEVELOPMENT AND ESTIMATE Update:10-11

    Hi,       I would like to know about the Estimate required for a particular requirement. For example,u  need to set up a generic extractor based on 2 tables and then replicate it on BW side. 1)Logistics invoice verification:-Do we have any standard E

  • Material cost estimate report development Update:10-11

    Hi All, Customer need a report with belwo inputs 1.Plant 2. Material 3. MRP Controller 4. Costing Variant 5. Valid On with M09 MRP controller with the output as - where M09 is there it should not display the sub-materilas in it,for the remaining it i

  • Cost component not splitting at the time of Rune the tine of Cost Estimate Update:10-11

    http// Hi, We are in developing phase for Product costing for coal mine project , we have raise coal material with Non component BOM , and Routing is only one activity with 400- Raised Coal Qty-MT , We upload the plan with Production cost center -act

  • Report for Cost Estimate Update:10-11

    Hi, Our client require a report for Planned Cost Estimate, where costing run will be on FG product and Client want Activity Hours and Cost for that FG product. (for all the FG products we have multilevel BOM and Routing hence, Activity Hours are main

  • How can I estimate the final size of my .ipa? Update:10-11

    Hello there, As far as I know there is no "scietific method" to find out how many megabytes will be added to an application after it was uploaded to the Apple Store. For example, my app in origin was 14.680.351 bytes and just when I've finished