Current Position:Home > Error while creating process instruction sheet in COR2

Error while creating process instruction sheet in COR2

Update:10-11Source: network consolidation
Advertisement
While creating Process instruction sheet, the following error is occuring. Please guide me to resolve the issue.
Define variable QTYPRODUCED for default value
Message no. CPOC110
Diagnosis
In the process instruction, variable QTYPRODUCED is defined for the value that you want the system to propose when data is entered in the PI sheet. This value does, however, not exist because it has not yet been defined as a variable.
If you want to use a variable in a process instruction, however, you must first have defined it in a preceding process instruction or in the same process instruction.
Procedure
Define variable QTYPRODUCED in one of the preceding process instructions or in the same process instruction.
Define Variable
Regards
Kumar

The Best Answer

Advertisement
1.  Assign characteristic PPPI_VARIABLE to the process instruction before the message characteristic to which the variable is to refer
2.  Assign the required variable name to characteristic PPPI_VARIABLE.
  • Error while creating process instruction sheet in COR2 Update:10-11

    While creating Process instruction sheet, the following error is occuring. Please guide me to resolve the issue. Define variable QTYPRODUCED for default value Message no. CPOC110 Diagnosis In the process instruction, variable QTYPRODUCED is defined f

  • Process instruction sheet configuration Update:11-30

    Dear Guru's, I am exploring SAP PP PI and not much into it,since it has been few months. I want to know more abt the PI SHEETS, and the way to configure it. Since my client is not using PI sheets, i want to explore this area and want to know more abt

  • Process instruction sheet and control recipe Update:11-30

    dear,        can u let me know how the process instruction sheet is created or maintained and how the control recipe and destination works. if I want to start with PI sheet and control recipe in my organisation , how do I go ahead with configuration

  • Error[#1314] Creating Process Update:11-30

    I'm receiving the below error when trying to execute a batch file. A windows agent is installed on the server where the batch files lives. The runtime user has admin rights on the server where the batch files lives as well. Does anyone have any insig

  • Creating new characteristic in Process Instruction Sheet Update:11-30

    I need to create new characteristics and i want them to appear on the PI sheet. i.e in the txn CO58. How do I do it?Dear Neeraj, First Define Char in O25C or CT04. Now check which Process Instruction Category You are using. You can check all PI categ

  • Error while creating service entry sheet Update:10-11

    Hi Experts, I am trying to create service entry sheets using bapi 'BAPI_ENTRYSHEET_CREATE'  for a purchase order with multiple line items. The bapi creates SES for the first line item but gives error 'User xxxxxx already processing purchase order nnn

  • Validity period error while creating Service Entry Sheet. Update:10-11

    Hi SAP experts, Users are facing below two error messages while creating serivce entry sheet with respect to Standard PO (NB).The PO has RFQ refrence where Validity start and end date is blank. Also PO has Item category 'D' (Services) 1) "Runtime of

  • Error: while creating Service Entry Sheet - for HELD PO Update:10-11

    Hi experts, While PO XXXXXXXXXX is in the status of Hold. System allowed me to create & delete a service entry sheet(SES) on particular date. Another day i tried to create SES for the same PO. System is not allowing me to create SES and it gives me e

  • Error on creating process order Update:11-30

    Hello All, I am new to PP-PI module. I have created resources and master recipe without Xsteps for a finished material. Now when i create a  process order for this material i am getting an error "No control data maintained for checking group 02 and c

  • "Error While creating Process Chain" Update:10-11