I had a problem with my List Cube Transaction and for that reason, I had a look at the Infoprovider and also the Data Sources.
When tried to execute the infoproviders in LISTCUBE, the following messages are being displayed in BWT system:
1. Error reading the data of InfoProvider ZIP_RC_01
2. There is still no data source assigned to VirtualProvider ZIP_RC_01
But, when executed the same in BWD, then it is working fine.
I have checked the Data Sources in the R/3 Dev system and the DS has no problem. But, when I check the DS in the R/3 Prod (SS in BWT system), the following error message is displayed in the status bar:
"DataSource Z_IP_RC_DS_1 is not defined in the source system"
I thought, as the system says the Source system is not available, hence the problem in LISTCUBE and thought if we transport the DS again and then replicate in BW, then our problem would be resolved.
But, seems that even though the source system says "PRD300", if I look at SM59 it actually points to our QAS system. It says PRD300 because BWT is a copy down from BWP, and that's the source system we use - in other words the logical name is the same, but the actual servers are different.
In any case, the datasource is transported to our QAS enviroment.
So, once we do a client copy from Prod to Test, even the source systems get copied. If yes, then does it really affect in case of replications and transports???
I am really confused in this part...please explain.
Thanks & Regards

The Best Answer

Advertisement
Hi,
It looks like the basis team, or whoever performed the Copy from production to QA box hasn't finished all the necessary Steps :
Main transaction to know:
SSC4 -> To create new client
SCCL -> Client copy within local system
SCC9 -> remote client copy
SCC3 -> display client copy log
http://help.sap.com/saphelp_nw04/helpdata/en/69/c24c4e4ba111d189750000e8322d00/content.htm
http://www.sap-basis-abap.com/bc/client-copy-from-production-to-quality-server-to.htm
http://searchsap.techtarget.com/tip/1,289483,sid21_gci552257,00.html
Probably sounds like transaction BDLS hasn't been done.
  • Client Copy from BWP to BWT Update:10-11

    I had a problem with my List Cube Transaction and for that reason, I had a look at the Infoprovider and also the Data Sources. When tried to execute the infoproviders in LISTCUBE, the following messages are being displayed in BWT system: 1. Error rea

  • Logical System and Client copy Update:10-11

    Hi Gurus ,              I just now finished ECC 6.0 successfully , I want to take the client copy . But i hacve one doubt , In client creation one TAB logical system is there , Kindly advice me how to create Logical system and steps . Regards SelvanH

  • Client copy with configuration data in R/3. Is there any effect on EBP sys Update:10-11

    Hi all, We are using classic scenario. Our client is reorganizing their Org structure for that we need to do client copy with only configuration data. In this scenario we are uploading the master and transactional data through ALE in order to retain

  • Unable to log in to newly create client copy Update:10-11

    I 'm attempting to create a new client from a newly installed ECC 6.0 IDES system. I go into SCC4 and create a new lient '200' and log off. I try to log in to client 200 using sap* and pass and get wrong username or password error. I can see the clie

  • Remote Client Copy Errors Update:10-11

    Dears, Today I am going to do remote client copy from PRD to QAS. For it yesterday i scheduled Test run in simulation mode.As i am having two CPU for both Dev and PRD so I scheduled it with 6 Parallel Processes. But my Test run failed with errors: Co

  • Remote Client Copy - Ended in Erros Update:10-11

    Hi Friends, We recently performed a Remote client copy. What we normally do is we restore an latest offline backup of the Prod into an instance built exclusively for performing client copies into our QA system. So if our actual PROD is ABC ( producti

  • Remote client copy performance Update:10-11

    Hello experts, I need an opinion on following possibilities that could speed up remote client copy: Increasing maximum number of processes for parallel processing in dialog mode? Increasing the update processes? Decreasing the undo retention from def

  • Remote Client Copy failed Update:10-11

    Hi, I am doing remote client copy from (Development Server - ECD 140) to our (Sandbox System - E6S 150) and the client copy keeps failing. I get the below error message. Please advise what is the solution to this problem? I am also copying the log fi

  • Remote client copy - scc9 Update:10-11

    Hi All am performing remote client copy through scc9, created RFC & tested connection, this server is not in the transport landscape. when i execute scc9 and select profile SAP_ALL from target system (Production server) it runs for 5-7 mins and ends

  • Remote client copy (SCC9) runs a very long time! Update:10-11