Current Position:Home > Cancel Process from task

Cancel Process from task

Update:11-30Source: network consolidation
Advertisement
Hello,
I did some research but did not find something like this. I need to cancel a process from within a task, for that, I defined a decision after the task verifying if the user clicked the "Cancel" button, and send it to a terminate event.
The problem is, the process is set to complete status, but the company needs it to be Cancelled as if I has cancelled it from the nwa.
Is it possible?
Thanks in advance!

The Best Answer

Advertisement
Hello Stefan, thanks for your answer.
Our client wants to leave the power to cancel the process in the event of it being not necessary (like a user that starts a process to create a material and then later he/she realizes it will not be necessary to create it) without the need of administrative intervention.
For that, there would be a button on some human interaction tasks. I sent the event of pressing this button to terminate the process but for a status it is set to complete, but the customer would like the process to be in canceled process in this event.
I don't think it's possible, but was looking for a way, as I am new to this technology.
Thanks in advance.
-h
  • Cancel Process from task Update:11-30

    Hello, I did some research but did not find something like this. I need to cancel a process from within a task, for that, I defined a decision after the task verifying if the user clicked the "Cancel" button, and send it to a terminate event. Th

  • OIM 10g : SQL Script to Delete or Cancel process instance tasks for user resources Update:10-11

    Hello, I have users with a resource with a process instance that have a large number (1000) of task instance related to reconciliations (Reconciliation Update Received). And when trying to revoke this resource, OIM take a long time to perfom this job

  • Inspection lot of cancelled process orders Update:10-11

    Hi Gurus, I would like to ask if there is an easier way of knowing if the order of an inspection lot was cancelled. Right now the business is on early lot creation, meaning once the order is created an inspection lot is also created. The problem is w

  • Firefox won't start, profile manager won't start, but firefox.exe shows in processes list (task manager) Update:10-11

    Firefox will not start, even though it is listed in my processes in task manager. Can't get profile manager to start either. I have tried the following to no avail: - try to start FF in Safe Mode, doesn't load - started Windows Vista in Safe Mode, FF

  • Firefox won't open. No error messages, no processes in task manager. Update:10-11

    Thought it might be an update issue as I was running FF 3.x when this issue started. I updated to 4.0 last night and it hasn't changed anything. FF opened and ran once, now not at all. No error message, no running process in task manager. Double clic

  • Issue with Bulk Load Post Process Scheduled Task Update:10-11

    Hello, I successfully loaded users in OIM using the bulk load utility.  I also have LDAP sync ON.  The documentation says to run the Bulk Load Post Process scheduled task to push the loaded users in OIM into LDAP. This works if we run the Bulk Load P

  • Can not Cancel Processing of Message in SXMB_MONI Update:10-11

    Hi all I'd like to clean up some outstanding error messages in SXMB_MONI but when I try to 'Cancel processing with errors' I get a message stating 'Can not cancel XML message with this status/type' The status is 'System Error - Restart not possible'

  • Unable to open PS Elements 11 once closed without Stopping the process in Task Manager Update:10-11

    Photoshop Elements 11 will not open once closed unless I either stop the Process in Task Manager or reboot the computer.  I have tried setting the program to run in Administrator mode but this did not work. I am running the program on a 64 bit Window

  • Triggering Process Definition Tasks Based on Changes to Multiple Attributes Update:10-11

    Hi All, I'm in the process of creating a custom GTC connector to provision accounts to an LDAP directory. I've got more than 100 user defined fields with the user object in OIM and about 60 of them will be kept in sync with the user accounts in LDAP.

  • Process Instance.Task Details.Update Date Update:10-11

    Hi experts, Process Instance.Task Details.Update Date Process Instance.Task Information.Update Date From these two dates which one captures the approval task assignment date. For e.g. If we reassign the approval task after some idle period to another